Happy Craft Brewery
The problem
This project brought its own set of tight constraints, with limited space to work within and multiple pipe lines running through the same area that needed careful sequencing. Tank dimensions had to be coordinated with the owner well ahead of arrival to ensure everything would fit and connect as planned. Add in a boiler and low pressure steam system, and the project demanded precise planning around a complex brewing process, where every line plays a specific role in getting the final product right.
The solution
Franco Plumbing and Heating brought the technical expertise and communication needed to keep every detail on track. We coordinated closely with the owner on equipment specifications well before the tank arrived, and worked out site logistics to place everything exactly where it needed to be within a tight footprint. Our understanding of the brewing process itself meant we could plan piping runs that supported the full production sequence, not just the mechanical requirements on paper. Where standard fittings wouldn't do the job, our team turned to field fabrication to get precise, custom solutions in place. It's this kind of process-level understanding that sets Franco apart as Moncton's go-to for complex commercial plumbing work.